How long is the production cycle of tag coated paper?

2024-09-25 10:24
1

The production cycle of tag coated paper will be affected by a variety of factors, including design complexity, production process, order volume, and production arrangements of the manufacturer. Therefore, it is difficult to give an absolutely uniform time. However, according to the general experience and industry situation, the production cycle of the following stages can be roughly summarized:


First, the design phase

Design cycle: Usually the design cycle will vary depending on the complexity of the client's needs and the productivity of the designer. Simple tag designs can take as little as a few days, while complex designs can take a week or more.

Second, production preparation stage

Material preparation: including the selection of appropriate coated paper, ink, gold/silver materials, etc. The time of this step is relatively short, but it also needs to be determined according to the availability of suppliers and the production arrangement of the manufacturer.

Platemaking: Create a printed version from a design, a step that usually takes a few days.

Third, printing production stage

Printing: The printing cycle will be affected by the printing equipment, production process and order volume. In general, the printing cycle of small batch orders is short, and the printing cycle of large batch orders is relatively long. For coated paper tags, if advanced printing equipment and processes are used, printing can be completed in a short time.

Post-press processing: including cutting, punching, gold/silver stamping, laminating and other post-press processing steps. The time of these steps will also vary depending on the complexity of the process and the efficiency of the equipment.

Fourth, inspection and delivery of finished products

Finished product inspection: After the printing is completed, the quality of the finished product needs to be inspected to ensure that the tag meets the design requirements and quality standards. This step is relatively short in time, but it is also an important part of ensuring product quality.

Delivery: Finally, the qualified tag is delivered to the customer. Delivery times are affected by factors such as logistics.


In summary, the production cycle of tag coated paper can be roughly divided into design stage, production preparation stage, printing production stage and finished product inspection and delivery stage. The timing of each phase will vary depending on the situation. In general, the entire production cycle from design to delivery can take anywhere from 5 to 15 working days if everything goes smoothly. However, please note that this time is for reference only, and the actual production cycle needs to be determined according to the specific situation.